Removing a seed disk, Row unit shut-off – Great Plains 3P4025AH Operator Manual User Manual

Page 67

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Adjustments

63

2014-07-29

Table of Contents

Index

411-099M

Removing a Seed Disk

Refer to Figure 68
1.

Remove rain cover. If seed is present, close
shutter

to prevent more seed from entering meter.

Attach funnel (page 80).

2.

Hold seed disk in meter. Rotate disk clamp
counterclockwise 45

° to release disk.

3.

Tilting top of disk toward meter, slowly remove disk,
allowing seed to collect in funnel. Open shutter to
release remaining seed up to wing tube.

4.

Clean seed from all brushes. Clean disk seat (

in

Figure 65

page 62), so that new disks can seat fully.

Inspect brushes for excess wear and damage. See
Meter Brush Maintenance” on page 81.

5.

Inspect removed disks for excess wear and damage.
Set aside any disks requiring replacement. Clean
other removed disks and place in storage. See
Seed Disk Maintenance” on page 83.

6.

Re-install the rain cover (page 60).

Row Unit Shut-Off

Skip-row operations, such as planting from every other
row when switching from 30 inch twin-row to 30 inch
single-row, requires shutting down unused rows.

Shutting off seeding at a row involves 4 to 7 steps:

1.

Identify the rows to shut off.

2.

Fully close seed inlet shutter (always done).

3.

Replace seed disk with blank disk (always done).

4.

Close seed flow to row at Y-tube (if present).

5.

Lock up row unit to reduce wear (optional).

6.

Reset monitor active row pattern and row spacing to
avoid nuisance alarms (always done).

7.

Shut off fertilizer drop lines (Option, see Seed and
Fertilizer Rate manual 411-099B for details).

Note: Meter drive is not disabled on 25AP row units

during shut-off.

Figure 68

Remove Disk

29611

3

1

4

4

1

2

Figure 69

Seed Inlet Shutter Closed

29609

2

1

Advertising