Field operation – Great Plains 3P4025AH Operator Manual User Manual

Page 41

Advertising
background image

Great Plains Manufacturing, Inc.

Table of Contents

Index

Operating Instructions

37

2014-07-29

Table of Contents

Index

411-099M

Field Operation

Perform all steps in “Pre-Start Checklist” on page 21
and “Field Set-Up Checklists” on page 36.

Consult seed monitor for alarms during planting. Check
that reported rates are consistent with your plan.

When reloading seed, check consumption against
anticipated use to that point.

First Pass Operation Checklist

Page

1.

Shutters set.

35

2.

Raise planter and line up at start of first
planting row.

23

3.

Prime meters with seed.
Leave fan running.

35

4.

Pull forward, lower planter, and begin
planting for a short distance.

23

5.

Stop. Assess:
• planting depth
• seed spacing
• press wheel operation

-

6.

Make necessary adjustments

40

7.

Resume planting.

-

Suspending Planting Checklist

Page

1.

Stop tractor

-

2.

Fan hydraulic circuit to Float or Neutral

32

3.

Raise planter

23

Ending Planting Checklist

Page

1.

Suspend operations as above, then

2.

Lights ON

-

3.

Transport

27

Advertising