Great Plains NP4000 40-foot Operator Manual User Manual

Page 3

Advertising
background image

Great Plains Manufacturing, Inc.

Cover

Index

iii

2012-03-28

Cover

Index

407-776M

©

Copyright 2010, 2011, 2012 All rights Reserved

Great Plains Manufacturing, Inc. provides this publication “as is” without warranty of any kind, either expressed or implied. While every precaution has been
taken in the preparation of this manual, Great Plains Manufacturing, Inc. assumes no responsibility for errors or omissions. Neither is any liability assumed for
damages resulting from the use of the information contained herein. Great Plains Manufacturing, Inc. reserves the right to revise and improve its products as
it sees fit. This publication describes the state of this product at the time of its publication, and may not reflect the product in the future.

Trademarks of Great Plains Manufacturing, Inc. include: Singulator Plus, Swath Command, Terra-Tine.

Registered Trademarks of Great Plains Manufacturing, Inc. include:

Air-Pro, Clear-Shot, Discovator, Great Plains, Land Pride, MeterCone, Nutri-Pro, Seed-Lok, Solid Stand,

Terra-Guard, Turbo-Chisel, Turbo-Chopper, Turbo Max, Turbo-Till, Ultra-Till, Verti-Till, Whirlfilter, Yield-Pro.

Brand and Product Names that appear and are owned by others are trademarks of their respective owners.

Table of Contents

Important Safety Information ......................................1
Safety Decals .................................................................7
Introduction ................................................................12
Using This Manual........................................................12
Description of Unit ........................................................12

Models Covered .......................................................12
Intended Usage ........................................................12
Document Family......................................................12

Owner Assistance ........................................................13
Application Overview.................................................14
Implement System Components ..................................14

Ground Drive System Components (Options) ..........17
Hydraulic Drive System Components (Options) .......18

Trailing Nurse Tank Components.................................19
Nutri-Pro

®

Rear Hitch (Option) .....................................19

Hitch (Option) and Nurse Tank Components (User-Pro-

visioned) ...........................................................20

Preparation and Setup ...............................................21
Initial Setup...................................................................21
Post-Delivery/Seasonal Setup......................................21
Pre-Application Setup...................................................21
Hitching Tractor to Applicator .......................................22

2-Point Hitching ........................................................22
Electrical Hookup......................................................23
Hydraulic Hose Hookup............................................24

Hydraulic Pump Hookup.......................................25

Raise Parking Stands ...............................................25

Leveling Implement ......................................................26

Set Application Depth ...............................................26
Front-to-Back Level (Spacers)..................................26

Variable Rate Setup (Option) .......................................27
Operating Instructions...............................................30
Pre-Start Checklist .......................................................30
Implement Locks ..........................................................31

Lift-Assist Lock Channels .........................................31
Outer Wing Lock Channels.......................................31
Wing Lock Pins.........................................................31
Inner Wing Lock Channels .......................................32

Inner Locks in Transport.......................................32
Inner Locks During Unfold ....................................32
Inner Wing Locks After Unfold..............................32
Inner Wing Locks in Field .....................................33
Inner Wing Locks Pre-Fold ...................................33

Outer Wing Fold Latches..........................................34

Raising/Lowering Applicator.........................................35

Raise For Transport (Folded) ............................... 35
Raise Pre-Folding (Unfolded)............................... 35
Lower While Folded ............................................. 36
Lower While Unfolded .......................................... 36
Field Lower........................................................... 36

Unfolding and Folding .................................................. 37

Unfolding (At Field) .............................................. 37
Unfolding (Parking, Storage, Service) .................. 38
Folding ................................................................ 39

Transport...................................................................... 40

Typical NP4000 Weights by Configuration........... 40

Transport Steps........................................................ 41

Final Implement Setup ................................................. 41
Loading Materials......................................................... 42

Filling Tanks ............................................................. 42

Tank Quick-Fill ..................................................... 42
Tank Lid Fill .......................................................... 43

Hitching Nurse Tank .................................................... 44

Mechanical Cart Hitching ......................................... 44

Making Nurse Tank Connections ................................. 44
Fertilizer Operation ...................................................... 45

Ground Drive Operation ........................................... 45
Hydraulic Drive Operation ........................................ 45
Boom Operation ....................................................... 45
Start-Up Preparation (Either Pump) ......................... 45
Ground Drive Pump Start-Up ................................... 46

Prime the Ground Drive System. ......................... 46

Hydraulic Drive Start-Up .......................................... 46
Field Operations (Either Pump)................................ 46
Pauses and Turns .................................................... 46

Ground Drive Pauses and Turns.......................... 46
Hydraulic Drive Pauses and Turns....................... 46

Monitor Operation (Option) .......................................... 47

Starting Application with Console............................. 47

Ending Application ....................................................... 48
Field Set-Up Checklists................................................ 49
Field Operation Checklists ........................................... 50

First Pass ................................................................. 50
Pass Turns ............................................................... 50
Ending Application ................................................... 50

Short-Term Parking...................................................... 51
Long-Term Storage ...................................................... 51
Adjustments ............................................................... 52
Application Height Adjustment ..................................... 53
Coulter Force ............................................................... 53

Advertising