Adjust final drive chain slack, Install fertilizer delivery, Install delivery tubes – Great Plains 800EW Operator Manual User Manual

Page 18: Ud f b

Advertising
background image

16 175-248A, -249A, -250A, -251A

175-253M

02/24/2010

Adjust Final Drive Chain Slack

Refer to Figure 21
Although the final drive chain

on the fertilizer box is

factory-installed, it may not be adjusted for ideal slack.

56. Review chain clip and slack reference information on

page 28. Adjust idler

for recommended slack.

Install Fertilizer Delivery

Small Seeds hoses, if present, are reconnected at
step 77 on page 19.

Install Delivery Tubes

Tubes may be oriented forward or backward, based on
user preference and other installed options.

Refer to Figure 22

57. At each row unit, select one (1) each new:

133-065D

SML SDS TB REINFORCEMENT RING

817-346C PLASTIC FERTILIZER TUBE

and two (2) new:

801-002C

SCREW HEX SLT10-16X1/2P.THD CT

Insert the fertilizer tube

in the rear delivery

hole

of the opener frame. Add a reinforcement

ring

and secure with two self-tapping

screws

.

Figure 21

Fertilizer Final Chain Routing

28305

U

D

F

B

112

229

112

229

Figure 22

Fertilizer Delivery Tube

16459

107

2

228

168

107

228

168

228

2

107

168

Advertising