Adjust final drive chain slack, Install fertilizer delivery, Install delivery tubes – Great Plains 800EW Operator Manual User Manual
Page 18: Ud f b

16 175-248A, -249A, -250A, -251A
175-253M
02/24/2010
Adjust Final Drive Chain Slack
Refer to Figure 21
Although the final drive chain
on the fertilizer box is
factory-installed, it may not be adjusted for ideal slack.
56. Review chain clip and slack reference information on
for recommended slack.
Install Fertilizer Delivery
Small Seeds hoses, if present, are reconnected at
step 77 on page 19.
Install Delivery Tubes
Tubes may be oriented forward or backward, based on
user preference and other installed options.
57. At each row unit, select one (1) each new:
133-065D
SML SDS TB REINFORCEMENT RING
817-346C PLASTIC FERTILIZER TUBE
and two (2) new:
801-002C
SCREW HEX SLT10-16X1/2P.THD CT
Insert the fertilizer tube
in the rear delivery
hole
of the opener frame. Add a reinforcement
ring
and secure with two self-tapping
screws
.
Figure 21
Fertilizer Final Chain Routing
28305
U
D
F
B
112
229
112
229
Figure 22
Fertilizer Delivery Tube
16459
107
2
228
168
107
228
168
228
107
168