Install supports and walkboard, Supports and walkboard, w/o small seeds, Lh walkboard support (w/o sgs) – Great Plains 800EW Operator Manual User Manual

Page 22

Advertising
background image

20 175-248A, -249A, -250A, -251A

175-253M

02/24/2010

Install Supports and Walkboard

Steps depend on drill configuration. The edge channels
of the walkboard wrap around support and/or frame
breaks. Using a specific order eases the tasks.

• If Small Seeds was not installed on the drill, continue

at step 81 below.

• If Small Seeds was installed on the drill, continue at

step 95 on page 22.

The decal application is covered in a later section of this
manual.

Supports and Walkboard, w/o Small Seeds

LH Walkboard Support (w/o SGS)

Refer to Figure 28

81. Select one (1) each new:

142-077D LH WLK BRD SUPP FERT
802-214C RHSNB 1/2-13X1 1/4 GR5
804-015C WASHER LOCK SPRING 1/2 PLT
803-020C NUT HEX 1/2-13 PLT

82. Position the support

, break up, inside the left

side rear frame. Insert the round head bolt

, from

outside drill left, at the top front hole

. Loosely

secure with lock washer

and nut

.

83. Select and three (3) sets new:

802-034C HHCS 1/2-13X1 1/4 GR5
804-015C WASHER LOCK SPRING 1/2 PLT
803-020C NUT HEX 1/2-13 PLT

Insert hex head bolts

from the outside, at the

remaining support-to-frame holes. Loosely secure
with lock washer

and nut

.

Figure 28

Walkboard Left Support (w/o SGS)

29572

6

172

120

191

U

D

B

F

R

L

204

178

120

178

204

191

120

178

6

204

191

172

204

191

172

204

191

Advertising