Install delivery hoses – Great Plains 800EW Operator Manual User Manual

Page 19

Advertising
background image

Install Hardware 17

02/24/2010

175-253M

Install Delivery Hoses

Start with the left-most fertilizer meter (row 1) on the drill,
and complete both of the step 58 through step 61 for
each row before moving to the next row. Meters are not
always directly above the rows they serve.

Refer to Figure 23

58. At each row unit, select one (1) each new:

800-016C

UPPER FERT HOSE CLAMP RATCHET

816-239C SEED HOSE 56 RIBS X 11 LONG

One end of the hose

has a 1

1

2

in (38.1mm) I.D.,

and the other end a 1

1

4

in (31.8mm) I.D. Slide the

clamp

onto the larger 1

1

2

in end of the hose.

59. Slide the larger 1

1

2

in end of the hose fully (about 2in

or 5cm) onto to the fertilizer drop tube

for the cur-

rent row.

Slide the clamp until it is centered about 1in (2.5cm)
below the end of the hose. Tighten the clamp.

60. Select one (1) new:

800-008C CLAMP HOSE 1 1/2 NO. 24

Open this clamp and slide it fully onto the smaller
1

1

4

in end of the hose, up against the ribs.

61. Slide the smaller 1

1

4

in end of the hose fully over the

top of the fertilizer tube

.

Open the clamp and release it about

1

2

in (13mm)

above the reinforcement ring

, measured near

the screw

.

62. Repeat step 58 through step 61 for each row.

Figure 23

Fertilizer Delivery Hose

16459

228

160

162

223

3

107

168

162

223

223

162

3

160

228

107

168

Advertising