Bio-Rad ProteinChip Qualification and Calibration Kits User Manual

Page 14

Advertising
background image

7. The time required to complete this procedure is variable, and it may require up to several

hours as the instrument continually collects data of a specific intensity. If the calibration routine
does not complete, run the procedure again with unused spots.

8. Once the procedure is complete, open ProteinChip data manager software, select the

instrument, and select Instrument > Reinitialize Instrument.

9. The maintenance procedure is complete. Record the operator name and date in the

ProteinChip SELDI OQ form.

11

10010680A.qxp 8/17/2007 1:58 PM Page 11

Advertising