2 - installation – Dynojet 250i: Pit Installation Guide User Manual

Page 23

Advertising
background image

In Ground Model 200iP/250iP Motorcycle Dynamometer Installation Guide

2-1

C

H A P T E R

2

I

NSTALLATION

This chapter will walk you through unpacking and installing the dynamometer. To
ensure safety and accuracy in the procedures, perform the procedures as they are
described.

This chapter is divided into the following categories:
• Dyno Drum Module Installation, page 2-2
• Eddy Current Brake, page 2-10
• Secure the Drum and Brake Module to the Pit Floor, page 2-16
• Pickup Card, page 2-17
• Carriage Plate and Tire Carriage, page 2-18
• Blower and Monitor Support Installation, page 2-21
• Cable Track Installation, page 2-26
• Routing Cables, page 2-28
• Power Carriage Installation, page 2-44
• Tire Stop Installation, page 2-45
• Final Adjustments and Tests, page 2-46
• Pit Covers, page 2-48
• Junction Box Cover, Cable Cover, and End Cap, page 2-55
• Zip Tube, page 2-56

Advertising
This manual is related to the following products: