Dynojet 250i: Pit Installation Guide User Manual
Page 74
Advertising

In Ground Model 200iP/250iP Motorcycle Dynamometer Installation Guide
C H A P T E R 2
Pit Covers
2-52
4
Place the left side drum cover over the drum module.
5
Verify all the cables are routed under the left drum cover and through the cable
routing opening.
6
Loosely secure the left side drum cover using four 3/8-16 x 1/2-inch button-head
flange screws. Do not tighten.
Figure 2-46: Install the Left Side Drum Cover
PD175
cable routing opening
Advertising
This manual is related to the following products: