Dynojet 250i: Pit Installation Guide User Manual

Page 74

Advertising
background image

In Ground Model 200iP/250iP Motorcycle Dynamometer Installation Guide

C H A P T E R 2
Pit Covers

2-52

4

Place the left side drum cover over the drum module.

5

Verify all the cables are routed under the left drum cover and through the cable
routing opening.

6

Loosely secure the left side drum cover using four 3/8-16 x 1/2-inch button-head
flange screws. Do not tighten.

Figure 2-46: Install the Left Side Drum Cover

PD175

cable routing opening

Advertising
This manual is related to the following products: