The high pressure blowers are an optional accessory. If you did not order the high
pressure blowers it is still necessary to route the blower cables to the junction box.
1

Route each blower cable (P/N 76950315) from the CPI through the designated
power pit conduit, through the pit, and out of the pit as shown.
Note: Be sure to keep the power and communications cables in different pit
conduits.

2

From the pit, route both cables into the junction box.

3

Attach the two blower connectors to the junction box using 4-40 screws.
Note: The blower connectors are attached to the blower cables.

4

Connect the cables from each blower to the connectors on the junction box.
Note: There is an extension cable (P/N 76950317) for the blower furthest from
the junction box. Plug the power cord from this blower into the supplied blower
extension cable and into the power source located at the junction box.

Figure 2-31: Route the High Pressure Blower Cables

PD167

CPI

dyno

electronics

route power cables

in designated conduit

blower connectors in

junction box

extension

cable

Advertising
This manual is related to the following products: