Chapter 2 test mode, 1 operation, 1 starting each mode – Rice Lake Ishida IGX & IGB Series - Service Manual User Manual

Page 10: 2 ending test mode

Advertising
background image

Manual No. 085-3435-07

9/45

IGB/IGX Series (Overseas Specifications) Service Manual

Chapter 2 Test Mode

The Test Mode is used to check the machine when maintenance is performed or to perform settings.

2.1 Operation

The keys used in the following diagram are for Asia/Oceania specifications. For specifications for other
countries, use the corresponding keys.

2.1.1 Starting Each Mode

Scale ON

Start

Check

Normal Mode

Test Mode

Program Mode

Voltage Check

(IGB only)

Setup Mode

Press for 2 seconds or more

Release
ON/OFF key,
Then press one
of these keys
while all
segments are
illuminated

Operation Manual

2.1.2 Ending Test Mode

C1 Mode
C2 Mode

C3 to C9

Mode

In Mode

In Mode

C3 to C9

Mode

Scale

OFF

You cannot return to Cx mode.

Advertising