10.7 Water connection

The water connection must be carried out by a qualified licensed

plumber.
The cold water connection must comply with DIN 1988 [or state

and local codes]

» Prior to installing the water heater, flush the line thoroughly.

H

M

C

1

5

6

2

3

4

Cold water

7

8

9

10

Hot water

13

14

12

11

26

_03

_01

_11

23

15

1 Vacuum breaker

2 Hot water connection (Union adaptor to 3/4")

3 Mixing valve (optional, supplied by installer)

4 Connection for T&P valve ¾"

5 T&P valve ¾", 0.69 MPa @99 °C (100 psi @210 °F) (supplied

with unit)

6 0.551 MPa (80 psi) relief valve (optional, supplied by

installer)

7 Expansion tank (optional, supplied by installer)

8 Straight-through shut-off valve (supplied by installer)

9 Check valve (optional, supplied by installer)

10 0.48 MPa (70 psi) pressure reduction valve (optional,

supplied by installer)

11 Cold water connection (with Union adaptor to 3/4")

12 Condensate drain (elbow supplied with unit)

13 Drain valve (supplied by installer)

14 Drain pan (supplied by installer)

15 Condensate spillover

» Remove the protective rubber caps from the connectors.

» With a sharp knife, cut a hole into the protective caps and

install them over the pipe to be connected.

» Connect the plumbing.

» After connecting the plumbing, connect the protective caps

so that the sheet steel casing of the water heater grips into

the outer groove of the protective cap.

Risk of damage through corrosion

To protect against the risk of corrosion, make the

connection with flat gaskets.

» Insulate the hot water line against heat loss.

» Install a drain valve at the lowest point of the cold water

supply.

Install a 0.48 MPa (70 psi) pressure reducing valve on the cold

water inlet.
Accurately maintain the order of fittings on the cold water side

(see diagram 10.7).

10.7.1 Safety valve (on-site provision)

This water heater is a sealed unit. A 0.69 MPa, 99 °C (100 psi,

210 °F) T&P relief valve must be installed.
When installing the T&P valve, observe the following:

- Size the drain line so that water can drain off completely,

even if the safety valve is fully open.

- The drain outlet must not be able to be closed and must

always remain open to atmosphere.

- The T&P valve must open at a pressure of 0.69 MPa (100 psi)

and be 3/4" pipe thread.

10.7.2 T&P valve (on-site provision)

WARNING Risk of injury through excessive pressure

and temperatures.

Install safety equipment that meets the applicable

regulations for the installation locations. In any case

install a "Pressure and Temperature Relief valve (T&P

relief)" that complies with the requirements of the

ANSI  Z21.22 ("Requirements for Relief Valves and

Automatic Gas Shut-off Water heaters for Hot Water

Supply Systems").

The T&P valve must respond at a pressure of 0.69 MPa

(100 psi). Fit the T&P valve into the opening on the

circumference of the water heater indicated.

Ensure that any expelled water cannot come into

contact with 'live' parts and will not run onto sensitive

surfaces. Ensure that the T&P valve outlet remains

free at all times.

10.8 Power supply: 240V / 15A double pole

circuit breaker

The electrical connection must be carried out by a qualified

electrician.

DANGER Electric shock

Contacting 'live' components results in a risk to life.

»

Disconnect the water heater from the power supply

before carrying out work on the control panel.

»

Be sure that no one can reconnect the power while

you are working.

When making a connection use code compliant disconnects.

» Undo the screws and remove the water heater cover.

Advertising