Cold water, Quick start-up guide | operation – STIEBEL ELTRON Accelera 300 User Manual

Page 4

Advertising
background image

EN

GL

ISH

WWW.STIEBEL-ELTRON-USA.COM

ACCELERA 300 |

4

QUICK START-UP GUIDE | OPERATION

H

M

C

Cold water

Hot water

2

12

15

13

14

11

3

4

5 6

7

8

9

10

1

1

Vacuum breaker

2

Hot water connection (Union adaptor to 3/4")

3

Mixing valve (optional, supplied by installer)

4

Connection for T&P valve ¾"

5

T&P valve ¾", 0.69 MPa @99 °C (100 psi @210 °F) (supplied with unit)

6

0.551 MPa (80 psi) relief valve (optional, supplied by installer)

7

Expansion tank (optional, supplied by installer)

8

Straight-through shut-off valve (supplied by installer)

9

Check valve (optional, supplied by installer)

10 0.48 MPa (70 psi) pressure reduction valve (optional, supplied by installer)

11 Cold water connection (with Union adaptor to 3/4")

12 Condensate drain (elbow supplied with unit)

13 Drain valve (supplied by installer)

14 Drain pan (supplied by installer)

15 Condensate spillover

Advertising