3 setting up, Installation – FRITSCH ANALYSETTE 18 User Manual

Page 17

Advertising
background image

Separate control device with con-

nection cable, euro-plug and wall

bracket
A 3 m PVC water hose is included

in the scope of delivery for the

wet version

2 ring bolts

4.3 Setting up

DANGER!
Do not step under the transport pallet during transport.

CAUTION!
Use a transport crane to lift the device out of the pack-

aging.

Installation

- 17 -

Advertising