2 clamping, 3 preparing for wet sieving, 2 sieve analysis in accordance with iso 2591-1 – FRITSCH ANALYSETTE 18 User Manual

Page 22: Using the device

Advertising
background image

5.1.2 Clamping

1.

Set up the test sieve stack (3).

2.

Pour the sieving stock in the top test sieve.

3.

Put on the machine lid (2).

4.

Tighten both nuts (1) at the same time.

See Ä Chapter "Sieve analysis in accordance with ISO

2591‐1".

5.1.3 Preparing for wet sieving

1.

Attach the wide spreading spray diffuser:
Push the wide spreading spray diffuser (5) through the transparent

screen (6); attach the sealing ring (7) and hose fitting (8). Tighten

them.

2.

Set up the sieve pan with outlet connector (4) and the test sieve

stack (3) and pour the sieving stock in the top test sieve.

3.

Put the machine lid (2) on and tighten both nuts (1) at the same

time.

4.

Slide the PVC water hose onto the wide spreading spray diffuser

and attach the outlet hose to the outlet on the sieve pan.

5.

Attach the wall bracket and mount the separate control device.

See Ä Chapter "Sieve analysis in accordance with ISO

2591‐1".

5.2 Sieve analysis in accordance with ISO 2591-1

During sieve analysis a certain amount of test stock is separated into

fractions by one or several test sieves. The difficulty with sieve analysis

lies in determining the cut-off point for the sieving process. It is recom-

mended to determine the analytical cut-off point.
Detailed information about sieve analysis is included on the standard

sheet:

Using the device

- 22 -

Advertising