Industrial Data Systems IDS 160 User Manual

Page 5

Advertising
background image

1.0 INSTALLATION


Installation begins with unpacking the IDS 160. Save packing materials
if the printer is to be re-shipped. Next, the IDS 160 needs to be made
ready to print. Examine the options available in the IDS 160 to
determine the best setup for your application.


1.1 UNPACKING THE IDS 160 PRINTER.

Remove the printer from the shipping container and verify all items
listed below are included.


Install printer ribbon

.


PACKING LIST CHECK OFF


IDS 160 PRINTER ______
PRINTER MANUAL ______
POWER LINE CORD ______
MATING CONNECTOR/CABLE ______


1.2 COVER INSTALLATION FOR DUSTY ENVIRONMENTS.

The cover over the print mechanism can be set in two positions. It is
set at the factory for paper to exit out of the top. For dusty
environments the access hole can be covered. Remove the two screws
which secure the hinged cover and reposition the cover forward. Use the
take up reel to take up the paper roll inside the cover.

Advertising