Chapter 2: installation, Chapter 2, 1 introduction – AERCO BMK 1.5 LN Dual Fuel Feb 2013 User Manual

Page 11: 2 receiving the unit, 3 unpacking, Benchmark 1.5ln dual-fuel low nox boiler, Gf-121, Chapter 2: installation 2.1 introduction

Advertising
background image

CHAPTER 2: INSTALLATION

PR2: 05/09/12 Page

11 of 162

Benchmark 1.5LN Dual-Fuel Low NOx Boiler

Operation and Maintenance Manual

OMM-0041_0C

GF-121

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288

CHAPTER 2: INSTALLATION

2.1 INTRODUCTION

This Chapter provides the descriptions and procedures necessary to unpack, inspect and install

the AERCO Benchmark 1.5 Dual-Fuel Boiler. Brief descriptions are also provided for each

available mode of operation. Detailed procedures for implementing these modes are provided in

Chapter 5.

2.2 RECEIVING THE UNIT

Each Benchmark 1.5 System is shipped as a single crated unit. The shipping weight is

approximately 1551 pounds. The unit must be moved with the proper rigging equipment for

safety and to avoid equipment damage. The unit should be completely inspected for evidence of

shipping damage and shipment completeness at the time of receipt from the carrier and before

the bill of lading is signed.

NOTE

AERCO is not responsible for lost or damaged freight.

Each unit has a Tip-N-Tell indicator on the outside of the crate. This indicates if the unit has

been turned on its side during shipment. If the Tip-N-Tell indicator is tripped, do not sign for the

shipment. Note the information on the carrier’s paperwork and request a freight claim and

inspection by a claims adjuster before proceeding. Any other visual damage to the packaging

materials should also be made clear to the delivering carrier.

2.3 UNPACKING

Carefully unpack the unit taking care not to damage the unit enclosure when cutting away

packaging materials

A close inspection of the unit should be made to ensure that there is no evidence of damage not

indicated by the Tip-N-Tell indicator. The freight carrier should be notified immediately if any

damage is detected.

IMPORTANT

After unpacking, take off the unit top panel and remove

the strap and packing material at the top of the heat

exchanger. The packing material is located in the area of

the ignitor-injector and staged ignition solenoid on the

burner assembly.

The following accessories come standard with each unit and are either packed separately within

the unit’s packing container or are factory installed on the boiler:

Pressure/Temperature Gauge

Spare Spark Ignitor-Injector

Spare Flame Detector

ASME Pressure Relief Valve

Condensate Drain Trap

1-1/2” Gas Supply Shutoff Valve

When ordered, optional accessories may be packed separately, packed within the boiler

shipping container, or may be installed on the boiler. Any standard or optional accessories

shipped loose should be identified and stored in a safe place until ready for installation or use.

Advertising