CHAPTER 2: INSTALLATION

Page

14 of 162 PR2: 05/09/12

Benchmark 1.5LN Dual-Fuel Low NOx Boiler

Operation and Maintenance Manual

OMM-0041_0C

GF-121

AERCO International, Inc. • 100 Oritani Dr. • Blauvelt, NY 10913 • Ph: 800-526-0288

In multiple unit installations, it is important to plan the position of each unit in advance. Sufficient

space for piping connections and future service/maintenance requirements must also be taken

into consideration. All piping must include ample provisions for expansion

.

If installing a Combination Control Panel (CCP) system, it is important to identify the

Combination Mode Boilers in advance and place them in the proper physical location. Refer to

Chapter 5 for information on Combination Mode Boilers.

2.5 SUPPLY AND RETURN PIPING

The Benchmark 1.5 Boiler utilizes 3” 150# flanges for the water system supply and return piping

connections. The physical location of the supply and return piping connections are on the rear of

the unit as shown in Figure 2-3. Refer to Appendix F, Drawing AP-A-832 for additional

dimensional data.

BOILER SUPPLY

3" – 150# FLANGED

CONNECTION

BOILER RETURN

3" – 150# FLANGED

CONNECTION

1-1/2”

NATURAL

GAS INLET

CONNECTION

SHELL DRAIN

VALVE

EXHAUST

MANIFOLD

REAR VIEW

1-1/2”

PROPANE INLET

CONNECTION

Figure 2-3: Supply and Return Locations

2.6 CONDENSATE DRAIN

The Benchmark 1.5 Boiler is designed to condense water vapor from the flue products.

Therefore, the installation must have provisions for suitable condensate drainage or collection.
The condensate drain pipe located on the exhaust manifold (Figure 2-4) must be connected to a

condensate trap which is packed separately within the unit’s shipping container.
The procedure to install and connect the condensate drain is provided in paragraph 2.6.1.