No loading (check of electrical systems) – CatEye EC-3600 User Manual

Page 19

Advertising
background image

Check Method of Causes

Repair Method

Explanation Figures

EC-1200 EC-1600 EC-3600 EC-3700

Applicable Models:

Cateye Ergociser Series 1000 Service Manual

17

Connector Terminal 3

T-5

T-5

[2]Checking the Electrical Systems

1. Connect the AC adapter, and turn on the power of the main

unit.

2. Obtain the manual training program, set the pedal torque

setting to 4.0kg·m, and rotate the pedal at the rate of 50 rpm. If
you can rotate it quite easily, no load will be applied.

3. Replace the control unit with a brand new one.

4. Again, check the torque status under the manual training

program.

When the pedal torque is loaded, the control unit is

defective.

When no torque loading is possible, proceed to the following

procedures.

1. Turn off the power, and loosen the four screws on the

handlebar stem to remove the control unit. (Fig. 1)

2. Remove the cable connector which is connected to the back of

the control unit. (Fig. 1)

3. Remove the frame cover. (See the Sections D1 & D2

"Removing the Frame Covers.")

4. Remove the CN-2 connector on the power supply board. (Fig.

2)

5. Using a tester, check for any short-circuiting across Terminal

1s and Terminal 4s at both ends of the 5P cable which
connects the power supply board and the control unit. (Fig. 3)

When there is no shortcircuit, the 5P cable is disconnected.

When it is short-circuited, proceed to the following procedures:

1. Remove the connector CN-1 from the power supply board,

and measure the resistance across Terminals 2 and 3 of the
connector. When the reading is in the range of 9

and 14

,

the connector is all right. (Figs. 4 & 5)

When the meter reading is exceedingly large, the solenoid

coil is defective.

When the meter reading is in the acceptable range, the

power supply board may be defective.

Fig. 1

Power Supply Board

CN-2 Connector

Fig. 2

Fig. 3

Normal when zero (0)

Connector
Terminal 4

5P Cable

Connector Terminal 4

Fig. 4

CN-1 Connector

Fig. 5

Connector
Terminal 2

To Solenoid Coil

CN-1 Connector

Normal for 14V thru 19V

No Loading (Check of Electrical Systems)

No Loading (Check of Electrical Systems)

Replace the control unit with a brand new one.

Replace the 5P cable with a brand new one. (See the

Section ES-2 " Replacing the 5P Cable.")

Replace the workload unit. (See the Sections MS-1 &

MS-2 "Replacing the Workload Unit.")

Replace the power supply board. (See the Section

ES-3 "Replacing the Power Supply Board.")

Advertising
This manual is related to the following products: