48
Operation
Theory
The operation flow is show as below:
The followings are timing diagrams of the DI-REQ and the input
data. The active edge of DI-REQ can be programmed by the func-
tion 5.5.
Figure 4-7: DIREQ as input data strobe (Rising Edge Active)