0020140413_01 - 09/12 - Glow-worm

11.6.2

Gas Rate

• Make sure that all other gas burning appliances and pilot

lights are off.

• Check the gas rate using the gas meter test dial and stop

watch, at least 10 minutes after the burner has lit, see table

below for approximate rates.

Gas rates (G20)

Gas rates (G31)

(approx) after 10 mins from cold

Model

MIN

MAX

MIN

MAX

m

3

/h

ft

3

/h

m

3

/h

ft

3

/h

kg/h

kg/h

24

0.85

30

2.54

89.7

0.62

1.87

28

0.88

31.1

2.96

104.05

0.645

1.87

In communal or LPG installations where the gas rate cannot be

measured it is acceptable to measure the combustion rate as

described in the servicing section.

• On completion, press the "reset" button to reset the boiler.

• Gas rates for both central heating and hot water can be verified

using the test program P.03 and P.01 respectively.

11.7 Testing heating system

• Ensure that the external controls and programmer are calling

for heat.

• Fully open all radiator valves, see chapter "Appliance

installation > Recommendations before installing > Heating

circuit design".

• Activate the C.H. function on the appliance's control panel.

• Balance the radiators as required to give the required system

differential.

• Turn off all radiators that can be shut off by the user and check

to see if less than the maximum differential allowed of 20°C

can be achieved across flow and return.

i

IMPORTANT:

Should the appliance require adjustment refer to the

"Specific adjustment" section overleaf.

• Allow the system to reach maximum temperature then switch

off the boiler by isolating from the electrical supply.

• Drain the entire system rapidly whilst hot, using the drain taps

at all the low points of the system. Fill and vent the system as

described previously in chapter "Commissioning > Filling the

CH system (Central heating)".

• Adjust the boiler temperature controls and any system controls

to their required settings.

11.8 Testing domestic hot water system

• Open a hot-water tap.

• Check that the temperature obtained is compliant with the

setting on the appliance.

11.9 Completion

• Ensure that the magnetic lighting instruction label is placed on

the surface of the boiler casing.

GB: It is a requirement that the “Benchmark” Installation,

Commissioning and Service Record is completed and left with the

user.

IE: it is necessary to complete a “Declaration of Conformity” to

indicate compliance to I.S.813. An example of this is given in the

current edition of I.S.813.

12 Specified Adjustment

12.1 Heating circuit adjustment

By pass operation is automatic and not adjustable.

• If necessary, fit an external by-pass.

Easicom 24

B

0

10

20

30

40

50

500

1000

1500

Key

A Available pressure between heating flow and return (kPa)

B Heating circuit flow rate (l/h)

Easicom 28

B

0

10

20

30

40

50

500

1000

1500

Key

A Available pressure between heating flow and return (kPa)

B Heating circuit flow rate (l/h)

INSTALLATION

- 23 -