Introduction, 3 regulation and statutory requirements, 4 hydraulic schematic – Glow-worm Easicom User Manual

Page 6

Advertising
background image

0020140413_01 - 09/12 - Glow-worm

2.3

Regulation and statutory requirements

2.3.1

CE Mark

This boiler meets the requirements of Statutory Instrument,

No. 3083 The Boiler (Efficiency) Regulations, and therefore is

deemed to meet the requirements of Directive 92/42/EEC on the

efficiency requirements for new hot water boilers fired with liquid

or gaseous fuels.

Type test for purposes of Regulation 5 certified by: Notified body

1312.

Product/production certified by: Notified body 0086.

The CE mark indicates that the appliances described in this

manual are in compliance with the following directives:

- European directive n°2009-142 relative to gas appliances

- European directive n°2004-108 from the European Parliament

and Council relative to electromagnetic compatibility

- European directive n°2006-95 from the European Parliament

and Council relative to low voltage

- European directive n°92-42 relative to the yield of boilers

2.3.2

Local regulations

Benchmark places responsibilities on both manufacturers

and installers. The purpose is to ensure that customers are

provided with the correct equipment for their needs, that it is

installed, commissioned and serviced in accordance with the

manufacturer’s instructions by a competent person approved

at the time by the Health and Safety Executive and that it meets

the requirements of the appropriate Building Regulations. The

Benchmark Checklist can be used to demonstrate compliance

with Building Regulations and should be provided to the

customer for future reference.

Installers are required to carry out installation, commissioning

and servicing work in accordance with the Benchmark Code

of Practice which is available from the Heating and Hotwater

Industry Council who manage and promote the Scheme.

• Visit www.centralheating.co.uk for more information.

2.4

Hydraulic schematic

15

14

13

12

11

10

9

7

8

5

6

4

3

2

1

16

17

18

19

20

21

24

23

22

25

26

Key

1 Gas isolating valve

2 Heating flow isolating valve

3 Heating safety valve

4 Filter on cold water inlet

5 DHW flow sensor

6 Water pressure sensor

7 Domestic plate to plate heat exchanger

8 Three way valve

9 by-pass

10 Heating return thermistor

11 Condensate trap

12 Ignition and control electrode

13 burner

14 Main heat exchanger

15 Thermal fuse

16 flue outlet

17 Silencer

18 Heating expansion vessel

19 fan

20 Gas control valve

21 Ignition module

22 Heating flow thermistor

23 Air vent

24 Pump

25 Heating return isolating valve

26 Domestic cold water isolating valve

A Heating flow

b Pipe for heating safety valve

C Domestic hot water outlet

D Gas

E

Cold water inlet

f

Heating return

G Condensate drain

INTRODUCTION

- 4 -

Advertising