Pre-installation preparation, Continued, Figure 6 - rough opening for fireplace – Desa DVF36TCR User Manual

Page 7: Figure 10 - vent opening height

Advertising
background image

www.desatech.com

112108-01C



PRE-INSTALLATION

PREPARATION

Continued

Figure 6 - Rough Opening for Fireplace

39

3

/

4

" Min.

40

1

/

2

"

24"

39

3

/

4

"

Min.

40

1

/

2

"

24"

*

Figure 7 - Rough Opening for Installing

Fireplace on Platform

* As required by design as long as

ceiling clearance is maintained.

Platform
Must Be
Solid, Flat,
and Fully
Supported

Figure 8 - Alternate Gas Supply Location

11

15

/

16

"

10

1

/

2

"

20

3

/

16

"

1

1

/

2

"

The gas supply line may be connected through

the side framing or alternately through the lower

sub-flooring or a platform base if provided (see

Figures 8). Depending on installation, refer to

appropriate illustrations.

Height

Depends

On

Installation

10

3

/

4

"

Square

Min.

Figure 9 - Rough Opening for Installing

Exterior Vent Terminal

Vertical

Height

Depends on

Installation

26

3

/

8

"

Horizontal

Length Depends

on Installation

90

o

Elbow

45

o

Elbow

Figure 10 - Vent Opening Height

Advertising
This manual is related to the following products: