Chapter 2: prerequisites – Labconco Bulk Powder Stations 3962622 User Manual

Page 7

Advertising
background image

Product Service 1-800-522-7658

3









Chapter 2:

Prerequisites


Before you install the enclosure, you need to prepare your site for installation.
Carefully examine the location where you intend to install it. You must be certain
that the area is level and of solid construction. A dedicated source of electrical
power should be located near the installation site to power the enclosure.
Additionally, the balance used inside the enclosure should be strategically placed
in the lab to avoid environmental influences.

Carefully read this chapter to learn the requirements for your installation site:

The support, vibration and movement requirements.

The temperature variation requirements.

The humidity and static electricity requirements.

The location and air current requirements.

The exhaust and blower requirements.

The electrical power requirements.

The space requirements.


Refer to Appendix B: Dimensions for XPert Bulk Powder Enclosures, Filtered
Systems and Filtered Stations.

Refer to Appendix C: Specifications for environmental conditions.

Advertising