Artesyn SCP-P4040-4G-ENP2 Installation and Use (August 2014) User Manual
Page 24
Hardware Preparation and Installation
SCP-P4040-4G-ENP2 Installation and Use (6806800P60B)
24
2. Check for damage and report any damage or differences to customer service.
3. Remove the desiccant bag shipped together with the product.
2.3
Installing and Removing the Module on the
Carrier Board
The heat sink/heat spreader is already assembled with the module before these operations.
Installing the COM module on the carrier board
1. Line up the board-to-board connector of the module assembly with the board-to-board
connector of the carrier board.
2. Make sure that the interconnectors are properly aligned and that the five standoffs on
the module have contact with the top of the carrier board.
3. From the bottom side of the carrier board, locate the screw holes on module and carrier
board.
4. Use the screws to fasten the module to the carrier board.
Removing the COM module from the carrier board
1. From the back side of the carrier, locate the five screws that connect the module assembly
to the carrier board.
Damage of Circuits
Environmental Damage
Improperly disposing of used products may harm the environment
Always dispose of used products according to your country's legislation and
manufacturer's instructions