Installing the gear train upgrade kit, Preparation – Gasboy Kit M04477K001 User Manual
Page 6
Advertising

Installing the Gear Train Upgrade Kit
Page 6
MDE-4291 Gasboy Gear Train Upgrade Kit M04477K001 • March 2004
Installing the Gear Train Upgrade Kit
Preparation
1
Request permission from the manager/owner to remove power from the unit and then remove
power using normal procedures. Observe the lockout/tagout safety procedures.
2
Using the proper key for the unit, unlock and remove the lower and upper doors from both
sides of the unit. Place doors in a safe place to prevent damage or scratches. (See
)
Figure 1: GasBoy Cover Removal
3
Make sure you have the proper kit for the model dispenser to be retrofitted.
Shows Doors
Removed Both Sides
Work Area
Junction Box Denotes
Side 1 or Front