Installing the M06228K001 or M06228K002 Kit
Page 12
MDE-4503 Atlas Discharge and Valve Conduit Retrofit Kit • July 2005
Figure 7: Flange to Frame Dimension
39
If there is a second meter, repeat steps 31 to 38.
40
If the meter shaft to computer/pulser joint was taped at the beginning of the process, remove
the tape and check the connection.
Reconnecting the Conduit:
41
While referencing
, thread the valve wires through the union half attached to the
junction box and into the box.
42
Tighten the conduit fittings.
43
Reconnect the wiring same as originally wired.
44
Replace the junction box cover and tighten the bolts.
45
Check all bolts and connections. Use start-up procedures as noted in MDE-2531.