MDE-4298D CFN Series Site Controller III Installation Manual · September 2009
Page 25
Conduit Layout/Installation Specifications
System Layout
• Consult the applicable section of this manual for specific system installation requirements.
• The RS-485 junction box must be grounded as specified in
on
.
• When used with Fuel Point, an extra dedicated junction box is supplied and should be
installed in the pump/dispenser. A separate, dedicated conduit should be run between the
junction box and the FPR. Refer to C35628 Fuel Point Reader Installation and Retrofit
Instructions Manual, for details.
• When using an ICR2, refer to MDE-2713 Universal Distribution Box Installation Manual
for conduit layout/installation requirements of the Two-wire Current Loop
communications. For an overview of ICR2 Communication wiring, refer to
.