Guralp Systems CMG-3ESPCD User Manual

Page 18

Advertising
background image

CMG-3ESPCD Digital Broadband Seismometer

Installing the 3ESPCD

3.6.1 Deployment

1. Prepare a hole of 60 – 90 cm depth to compacted subsoil, or down to

the bedrock if possible.

2. Clean the hole down to the bottom, and remove any loose material from

the mouth. Ensure that the bottom of the hole is relatively flat.

3. If the bottom of the hole is made of hard rock, you may need to put in

some loose sand or soil so that the sensor can be levelled.

4. Connect the sensor to cables for the GPS unit and power source.

MAN-C3E-0002

18

Issue B - November 2013

Advertising
This manual is related to the following products: