9general installation – Infloor Standard Electric Cable User Manual

Page 9

Advertising
background image

Infloor Installation Manual

9

General Installation

STEP 5.5 Measure about 3” from the wall for the strap . In counter or vanity

kick-spaces, install the strap so the cable will be 1-1/2” to 2” away from the

vanity base .

STEP 5.6 Cut the strap to fit the length of the first area .

STEP 5.7 Secure the strap to the floor . Depending on the floor type, differ-

ent methods may be used . Refer to the instructions provided with the strap

for full details .

· Plywood, cement board, or similar: Galvanized nails or screws may be

used to secure the strap every 6” to 10” .

· Concrete or similar: Concrete nails or similar. Double-sided tape (if

factory supplied with your cable), hot glue, or strong spray adhesive may

be used if the floor is well cleaned

and the strap is wiped free of any oils .

However, it is highly recommended to

also screw the strap down in several

places to ensure it does not come

loose . If using a strong spray adhesive,

apply to both the back of the strap

and the floor where it will be placed,

and carefully follow all spray manufac-

turer’s instructions and cautions .

STEP 5.8 Cut another piece of strap

for the other end of the area and

secure 3” from the wall(s) or other

obstruction(s) .

STEP 5.9 Unreel the power leads of

the cable up to the factory splice . Let

the coil of power leads sit on the floor

for now . Beyond the factory splice is

the heating cable itself . Factory splice

must be installed in the mortar bed .

CAUTION: Completely embed the

factory splices and heating cable in

the mortar, and never bend the fac-

tory splices. NEVER allow any part of

the splice or heating cable to enter a

wall or drop through the subfloor.

STEP 5.10 Before installing more

strap, fill in the first section with cable .

Begin by making a “strain-relief” at the

beginning so the cable is not acciden-

tally pulled loose . Zigzag the cable

under the tabs only as shown . Press

the tabs down to secure the cable .

STEP 5.11 Weave the cable back and

forth across the area at the desired

spacing until the other side of the

room has been reached . Once this

area is completed, press down all the

tabs . NEVER space the cables less than

2” apart .

STEP 5.12 If there are additional

areas to cover with cable, cut the

lengths of strap necessary, attach

them to the floor, and begin weaving

the cable into that area .

STEP 5.8

STEP 5.10

STEP 5.11

STEP 5.9

STEP 5.5

STEP 5.7

STEP 5.6

Advertising