Installation – Desa VMH10TPC User Manual

Page 16

Advertising
background image

www.desatech.com

112462-01F

16

11. Route power cord out of the cabinet by in-

serting it through the bushing on the outer

casing (see Figure 16, page 15). Plug fan kit

into 120-Volt grounded power supply and test

operation. Note: When switch is in the AUTO

position, the fan will start after the fireplace

has run for a few moments. The fan will

continue to run for several moments after the

fireplace has been turned off. When switch is

in the ON position, the fan will run until turned

to OFF. Reinstall upper louver (see Figure 15,

page 14). Close lower louver door.

INSTALLATION

Continued

Red

Red

Fan Switch (Auto/Of

f/On)

Blue

Blue

Thermostat

Switch (N.O.)

Green

White

Green

White

On

11

0/1

15

V

.A.C.

Blower Motor

Black

Of

f

1

2

3

Auto

Figure 19 - Wiring Diagram For Blower

Accessory Built-In Installation

For Built-In Installation

WARNING: A licensed elec-

trician must connect the wiring

harness to electrical supply

following all local codes. Electri-

cian must provide a clamp on the

box cover to secure the wiring.

Wiring should be routed through

the bushing in the hole on the

outer casing of fireplace.

1. Locate fan switch cover. Remove bottom

screw to remove back portion of the cover

(see Figure 18).

2. Install a snap bushing found in hardware kit into

one of the holes on rear of fan switch cover. The

other hole is for a strain relief clamp (not sup-

plied) to secure incoming electrical supply.

3. Follow steps 3 through 7 in Installing Blower

Accessory, page 14.

4. A licensed electrician must follow the wiring

diagram to connect incoming electrical supply

to fan kit wiring harness (see Figure 19).

Figure 18 - Installing Switch Plate to Fan

Switch Cover

Switch
Cover
Screw

Screw

Rear
- Fan
Switch
Cover

Front - Fan
Switch Cover

Switch Plate

5. Install the switch plate on front of fan

switch cover with 2 #10 screws provided

(see Figure 18). Using screw removed in

step one, reconnect front and rear of fan

switch cover.

6. Plug power cord to the outlet receptacle (not

provided) as shown in Figure 20, page 17. Wind

extra cable of power cord and tie it up with the

plastic wire strap (see Figure 20, page 17). Set

the cable bundle between the fan switch box

and outer casing, away from the burner.

7. Test to make sure the blower is working

properly.

8. Reinstall upper louver (see Figure 15, page 14)

and close lower louver.

Extension Cord
Use extension cord if needed. The cord must have

a three-prong, grounding plug and a three-hole

receptacle. Make sure cord is in good shape. It must

be heavy enough to carry the current needed. An un-

dersized cord will cause a drop in line voltage. This

will result in loss of power and overheating. Use a

No. 16 AWG cord for lengths less than 50 feet.

Advertising
This manual is related to the following products: