4 additionally required materials – SMA MULTICLUSTER BOX 36 User Manual

Page 11

Advertising
background image

SMA Solar Technology AG

4  Additionally Required Materials

Operating Manual

MC_BOX_36-BE-en-20

11

4 Additionally Required Materials

Material

Number of units Explanation

Screws and screw anchors

4

For securing the base of the
Multicluster Box

Terminal lugs M12

12

For connecting the generator, PV plant
and loads

Connection cables, installation
and cable-laying material

For connecting the generator, PV plant
and loads

Distribution board with protection
units

2

One distribution board each for the PV
plant and the loads

LV/HRC fuse link, as required

6

The fuse links for the generator and the
loads must be dimensioned to match the
system. 500 A LV/HRC size 3 fuse links
are installed in the fuse switch by
default.

Cable tie

To retain the Sunny Island connection
cables

Agent to counteract freeze damage
to seals (e.g., talcum, petroleum jelly
or wax)

To protect door seals from freezing