4  Additionally Required Materials

Operating Manual

MC_BOX_36-BE-en-20

11

4 Additionally Required Materials

Material

Number of units Explanation

Screws and screw anchors

4

For securing the base of the
Multicluster Box

Terminal lugs M12

12

For connecting the generator, PV plant
and loads

Connection cables, installation
and cable-laying material

‒

For connecting the generator, PV plant
and loads

Distribution board with protection
units

2

One distribution board each for the PV
plant and the loads

LV/HRC fuse link, as required

6

The fuse links for the generator and the
loads must be dimensioned to match the
system. 500 A LV/HRC size 3 fuse links
are installed in the fuse switch by
default.