4 additionally required materials – SMA MULTICLUSTER BOX 36 User Manual
Page 11
![background image](/files/818486/content/doc011.png)
SMA Solar Technology AG
4 Additionally Required Materials
Operating Manual
MC_BOX_36-BE-en-20
11
4 Additionally Required Materials
Material
Number of units Explanation
Screws and screw anchors
4
For securing the base of the
Multicluster Box
Terminal lugs M12
12
For connecting the generator, PV plant
and loads
Connection cables, installation
and cable-laying material
‒
For connecting the generator, PV plant
and loads
Distribution board with protection
units
2
One distribution board each for the PV
plant and the loads
LV/HRC fuse link, as required
6
The fuse links for the generator and the
loads must be dimensioned to match the
system. 500 A LV/HRC size 3 fuse links
are installed in the fuse switch by
default.
Cable tie
‒
To retain the Sunny Island connection
cables
Agent to counteract freeze damage
to seals (e.g., talcum, petroleum jelly
or wax)
‒
To protect door seals from freezing