2 cable entries in the floor – SMA MULTICLUSTER BOX 36 User Manual

Page 21

Advertising
background image

SMA Solar Technology AG

7  Electrical Connection

Operating Manual

MC_BOX_36-BE-en-20

21

7.1.2 Cable Entries in the Floor

Figure 8: Cable entries

G

Busbars =MC-X3 PV-System for connecting the line conductors and the neutral
conductor of the PV plant

H

RJ45 pin connectors for connecting the control and measuring cables and the data
cable

I

Circuit breakers for the Sunny Island inverters

K

Connection area for connecting the Sunny Island power cables

Object

Description

A

Double-membrane seal for the connection cables of the generator

B

Double-membrane seal for the connection cables of the loads

C

Double-membrane seal for the connection cables of the PV plant

D

Cable support sleeve for the three control and measuring cables and the data cable

E

Double-membrane seal for the Sunny Island power cables

Object

Description