SMA MULTICLUSTER BOX 36 User Manual

Page 30

Advertising
background image

7  Electrical Connection

SMA Solar Technology AG

30

MC_BOX_36-BE-en-20

Operating Manual

Procedure:

1. Insert the connection cables in the Multicluster Box and prepare (see Section 7.4, page 24).
2. Connect the grounding conductor to the grounding

busbar (AF 19, torque: 25 Nm). Make sure to
adhere to the following screw assembly:
screw head / terminal of neutral conductor /
terminal lug / fender washer / spring washer / nut.

3. Connect the neutral conductor and the line

conductors to the busbars MC-X3 PV-System
according to the labels (AF 19, torque: 25 Nm).
Make sure to adhere to the following screw
assembly: screw head / busbar / terminal lug /
fender washer / spring washer / nut.

4. Attach the connection cable to the designated cable support rail. Use the cable clamps and

counter sleeves supplied.
Securing the cable in the support rail relieves the strain on the cable at the connection point.

Advertising