SMA SB 3300-11 Installation User Manual

Page 25

Advertising
background image

SMA Solar Technology AG

Electrical Connection

Installation Manual

SB33-38-11-IA-en-62

25

5.3.2 Connecting the Inverter to the Power Distribution Grid (AC)

Overview of the AC Connection Socket

Procedure

1. Check the line voltage and compare with "V

AC nom

" on the type label.

The exact operating range of the inverter is specified in the operating parameters.
The corresponding document can be found in the download area at www.SMA.de/en,
in the "Technical Description" category of the respective inverter.

2. Disconnect the miniature circuit-breaker and secure against re-connection.
3. If necessary, exchange the sealing ring of the threaded sleeve with the sealing ring provided.

– Pull the sealing ring out of the threaded sleeve.
– Insert the smaller sealing ring.

4. Pass the pressure screw (E) over the AC cable.

Object

Description

A

Protective cap for socket element

B

Jack element

C

Threaded sleeve with sealing ring for cable diameters of 10 mm to 14 mm

D

Sealing ring for cable diameters of 6 mm to 10 mm

E

Pressure screw

Advertising
This manual is related to the following products: