Installing the FN10

Fast Network 10 User Guide

Page 2-5

Rack-mounting an FN10

The table below describes some general considerations you should be
aware of before mounting a FN10 in a rack assembly.

The FN10 can be rack-mounted in a standard 19-inch equipment cabinet.
To mount the FN10 in a rack assembly, apply the following steps:

1. Attach the rack-mount brackets to either side of the FN10 chassis.

Table 2-3

General Considerations for Mounting a FN10

Consideration

Discussion

Temperature

Since the temperature within a rack assembly may
be higher than the ambient room temperature,
make sure the rack-environment temperature is
within the Operating Temperature range specified
in Appendix A.

Air Flow

Make sure there is at least 2 inches (or more) on
both sides of the FN10 to allow for adequate air
flow.

Mechanical Loading

Do not place equipment on top of a rack-mounted
FN10.

Circuit Overloading

Make sure the power supply circuit to the rack
assembly is not overloaded.

Grounding (Earthing)

Rack-mounted equipment should be grounded. In
addition to the direct connections to the main power
supplies, make sure all the other supply
connections are also grounded.