2 led indicators, 3 injector rear panel – PLANET HPOE-1200G User Manual

Page 13

Advertising
background image

The following is the summary table of Reset button functions

:

Reset Button Pressed and Released

Function

About 1 second

Reboot the PoE Injector Hub.

About 8 seconds

Reset the PoE Injector Hub to Factory Default configuration.

The PoE Injector Hub will reboot and load the default IP

settings as shown below.

Be sure that you back up the current configuration of PoE Injector Hub before resetting PoE

Injector Hub or else the entire configuration will be erased when pressing the “RESET” button.

2.1.2 LED Indicators

The front panel LEDs indicates instant status of system power, Management port Link/Active and PoE port links, helps

administrator to monitor and troubleshoot when needed.

LED

Color

Function

FAN1 Failed

Green

Lights

to indicate FAN1 has stopped.

FAN2 Failed

Green

Lights

to indicate FAN2 has stopped. (Only for HPOE-2400G)

Power1

Failed

Green

Lights

to indicate power supply 1 has failed.

Power2

Failed

Green

Lights

to indicate power supply 2 has failed. (Only for HPOE-2400G)

Power

Green

Lights

to indicate power on.

PoE In-use

Green

Lights

to indicate that the port is in use and supplying 48V DC power.

2.1.3 Injector Rear Panel

The rear panel of the PoE Injector Hub indicates an AC inlet power socket, which accepts input power from 100 to 240V

AC, 50/60Hz.

Figures 2-1-4 & 2-1-5

show rear panel of the PoE Injector Hub.

Figure 2-1-4:

HPOE-1200G Rear Panel

Figure 2-1-5:

HPOE-2400G Rear Panel

13

User’s Manual of HPOE-1200G / HPOE

2400G

Advertising
This manual is related to the following products: