107bemail destination type – Honeywell EN2Z-0906GE51 R0708 User Manual

Page 109

Advertising
background image

USER GUIDE

ARENA/ RANGER

109

EN2Z-0906GE51

R0708

Or,

h. Copy switchpoints from another daily schedule to the new daily schedule as

follows:

i. Right-click on the new daily schedule.
j. Select Copy switchpoints from, then click on daily schedule from which you

want to copy the switchpoint settings, for example, Workday.

The copied settings are reflected on the daily schedule time table on the right.

4. Click

Save

button on top of the Schedules tree.


Update Daily Schedule / Edit Switchpoint

This function allows updating a daily schedule by editing the following switchpoint

settings:

• Value

• Start and stop time

• Optimization status


1. In

the

Schedules

tree, expand the tree and click on the daily schedule you want

to update.

2. In the time table, right-click in the switchpoint area (green) and click Update.

The Edit Value dialog box displays.

Advertising