Exiting split mode, Test core/net 1 and core/net 0 – Meridian Audio M3900 User Manual

Page 150

Advertising
background image

Page 150 of 174

Appendix A: Flash Download procedure

553-3001-216 Standard

5.00

January 2002

The system automatically performs a sysload, duringwhich several messages
appear on the system terminal. Wait for DONE and then the INI messages to
be displayed before continuing.

Exiting split mode

1

Connect the CPSI port or maintenance SDI port.

2

Enable the CNI cards by settingthe ENB/DIS faceplate switch to ENB
in Core/Net 0.

3

Perform the followingin uninterrupted sequence:

a.

Press and release the MAN RST button in Core/Net 0.

b.

When SYS700 messages appears on LCD display on Core/Net 0, set
the MAINT/NORM switch to NORM in Core/Net 0.

In 60 seconds, the LCD displays and confirms your processes with:
RUNNING ROM OS
ENTERING CP VOTE

An HWI534 message indicates the start of memory synchronization. In
10 minutes, an HWI533 message on Core/Net 1 CSPI or SDI terminal
indicates the memory synchronization is complete.

4

In Core/Net 1, set the MAINT/NORM switch on the CP card to NORM.

Test Core/Net 1 and Core/Net 0

1

Perform a redundancy sanity test usingthe followingsequence:

LD 135

STAT CNI Get status of CNI cards

STAT CPU Get status of CPU and memory

TEST CPU Test the inactive Core/Net

TEST CNI c s Test each inactive CNI card

Advertising