Ex 5/7/11 rt system – MGE UPS Systems EX 7RT User Manual

Page 38

Advertising
background image

Figure 2-12b: Step 3; Typical Straight Metal Conduit installation.

Figure 2-12c: I/O Box Terminal Block Diagram.

EX 5/7/11 RT System

Installation

2 — 14

86-86000-00 A01

5.

Typical Straight Conduit Installation

(a)

NOTE: Place lug ring inside
the terminal block cover.
Screw coupling into lug ring.

(b)

(c)

(d)

OFF

O

OFF

O

(e)

5.

Typical straight metal conduit
Installation.

a)

Secure strain relief onto the
terminal block cover as shown.

b)

Insert three wire through flexible
conduit.

c)

Strip the insulation of each wire
back 1/2” to expose solid wire.

CAUTION:

Always connect the

earth ground wire first.

d)

Secure three wires into the terminal
block using guide printed on bottom
of I/O box.

e)

Twist the conduit onto the coupling
body as shown.

L6 L5 L2 L1 L1 L4 L3

Jumper

Output

200/208/220/230/240Vac

Normal AC Source

200/208/220/230/240Vac

Bypass AC Source

200/208/220/230/240Vac

Advertising
This manual is related to the following products: