2 quarterly inspection, 3 biannual inspection – Sierra Monitor Corporation HRG015-W User Manual

Page 56

Advertising
background image

HRX-OM-J049-A
Chapter 6 Unit Maintenance

6.2 Inspection and Cleaning

HRG010-W HRG015-W

1st edition : Aug. 2006

Rev. A: May. 2007

6-4

6.2.2 Quarterly

inspection

„

Replacement of circulating fluid

z

Periodic replacement of circulating fluid (fresh water)

Potential algae growth or aqueous corrosion may occur if the old fluid is reused.
Assure a periodic replacement of the fluid according to the situation.

z

Cleaning of tank

Check the circulating fluid in the tank for impurities and foreign matters, and
the tank for slime inside. Assure a periodic cleaning of the tank.

„

Cleaning of facility water

z

Water quality standards for faciliry water should fall within specifications.

z

Assure a periodic cleaning of faciliry water equipment and a periodic

replacement of faciliry water.

6.2.3 Biannual

inspection

„

Check for leak from the pump mechanical sealing

Remove the panel and check for leak from the pump mechanical sealing. When a
leak is found, it is necessary to replace the mechanical sealing. Contact the local
distributor or SMC’s sales branch.

z

Leak from the mechanical sealing

Leakage from the mechanical sealing occurs in structure. Although JIS defines
leakage for 3cc/hr or less (reference value), 0.3cc/hr or more is our leakage
standard suggested for the replacement of the mechanical sealing.
A recommended replacement cycle of the mechanical sealing is 6000 to 8000
hours a year (usually).

Advertising
This manual is related to the following products: