System Start-up

(continued)

SCH Collectors Installation & Operation Manual

Clamp ring screw connections

■ Cut the copper pipe to length and deburr.

■ First, slide the clamp ring nut over the pipe, then clamp the
ring itself.

■ Insert the prepared pipe into the screw connection until its
stop is reached.

■ Tighten clamp ring nut by hand.

■ Use open-ended wrench to tighten clamp ring screw
connection (approximately 33 ft. lb.), retighten if necessary.

■ When tightening the clamp ring screw connection, use two
wrenches–using one wrench to prevent the pumping station
from turning.

■ Close the fill/flush valve (forward flow) and switch off the

filling and flushing pump.

■ Open return ball valve (by turning the blue thermometer

handle 90° counter-clockwise until it stops).

■ The solar system features an air separator. Open the

bleeder valve until the solar liquid exits free of air bubbles.

■ Only if collector bleeder is installed: Bleed the system on

the collector until the solar liquid exits free of bubbles.

■ If necessary, increase the test pressure again to 60

psi and check the system for leaks. If the pressure gauge

shows the pressure dropping substantially, you have a leak

in the system.

■ Set the operating pressure to 60 psi as prescribed by the
system

manufacturer.

■ Start up the circulation pump at maximum speed and

allow liquid to circulate for at least 15 min.

■ Remove the filling station hoses and screw the caps on the

flushing and filling valves.

■ Check the system again for leaks. Use the red and blue

thermometer handles to fully open the forward flow and

return ball valves.

■ Activate speed control on solar control unit. The highest
speed level should be set on the pump (phase control).

Note: The minimum speed set on the solar control unit must
not fall below the pump’s minimum nominal speed. Note
instructions for pump and solar control unit.

■ Once the installation settings have been completed and

checked, fit the solar station’s front insulation shell.

■ Refer to the collector manufacturer’s recommendations for

minimum flow requirements.

Flat seal screw connections

■ All pre-fitted solar station screw connections are firmly
tightened in the factory so that they do not need to be
retightened.

Torque levels when tightening flat seal screw connections
using AFM 34 flat seals, s = 2mm.

– 3/4" screw connection 26 Ft. lb

– 1" screw connection 40 Ft. lb

– 1 1/4" screw connection 66 Ft. lb

– 1 1/2" screw connection 96 Ft. lb

Operation, multi-function ball valve and

check valve

■ The forward flow ball valve must be open for filling, flushing
and bleeding solar systems with a filling and flushing pump.
The return ball valve should be closed.

■ Both flow checks should be opened in order to bleed the
solar system (thermometer handles in 45° position).

■ The two mult-function ball valves must be fully open in
order to bleed the solar system (turn the red and blue
thermometer handles counter-clockwise until the stop is
reached).

Figure 6-1 Forward flow multi-functioning instruments

SETTING FOR OPERATIONS,

FILLING, FLUSHING, DRAINING

FLOW CHECK CLOSED

BALL VALVE OPEN

DRAINING

FLOW CHECK OPEN

BALL VALVE 1/2 OPEN

SERVICE

BALL VALVE

CLOSED

Figure 6-2 Return multi-functioning instruments

SETTING FOR OPERATIONS

FLOW CHECK CLOSED

BALL VALVE OPEN

DRAINING

FLOW CHECK OPEN

BALL VALVE 1/2 OPEN

SERVICE, FILLING FLUSHING

BALL VALVE CLOSED