UPS INSTALLATION PLAN AND UNPACKING

EATON Powerware

®

9395 UPS (650–825 kVA) Installation and Operation Manual

S 164201725 Rev 2 www.powerware.com

3−19

3.2.3

UPS System Interface Wiring Preparation

Control wiring for features and options should be connected at the customer interface
terminal blocks located inside the UPS.

W

A

R

N

I

N

G

Do not directly connect relay contacts to the mains related circuits. Reinforced insulation to the mains is
required.

Read and understand the following notes while planning and performing the
installation:

S

Use Class 1 wiring methods (as defined by the NEC) for interface wiring up to 30V.
The wire should be rated at 24V, 1A minimum.

S

Use Class 2 wiring methods (as defined by the NEC) for interface wiring from 30V
to 600V. The wire should be rated at 600V, 1A minimum and 12 AWG maximum.

S

Use twisted-pair wires for each input and return or common.

S

All interface wiring and conduit is to be provided by the customer.

S

When installing external interface wiring (for example, building alarm, relay output,
battery breaker trip, and X−Slot) to the UPS interface terminals, conduit must be
installed between each device and the UPS cabinet.

S

Install the interface wiring in separate conduit from the power wiring.

S

When installing internal interface wiring to X−Slot terminals, route the wiring
through the internal opening in the X−Slot communication bay.

S

All building alarm inputs or remote features require an isolated normally-open
contact or switch (rated at 24 Vdc, 20 mA minimum) connected between the alarm
input and common terminal. All control wiring and relay and switch contacts are
customer-supplied.

S

The building alarms can be programmed to display the alarm functional name.

S

LAN and telephone drops for use with X−Slot connectivity cards must be provided
by the customer.

S

The UPS battery aux signal wiring from the UPS must be connected to the battery
disconnect device.

S

A supplemental 48 Vdc shunt trip signal for the battery disconnect device is
provided, but is not required for normal operation.

S

Battery aux and 48 Vdc shunt trip wiring should be a minimum of 18 AWG.

S

The REPO feature opens all contactors in the UPS cabinet and isolates power from
your critical load. Local electrical codes may also require tripping upstream
protective devices to the UPS.

S

The REPO switch must be a latching−type switch not tied to any other circuits.

S

A jumper wire must be connected between pins 1 and 2 on TB1, if the
normally-closed REPO contact is not used.

S

REPO wiring should be a minimum of 22 AWG and a maximum of 14 AWG.

Advertising