background image

POWER TERMINAL LOCATIONS

063006

D

DESCRIPTION:

DATE:

DRAWING NO:

SHEET:

REVISION:

164201546---6

(SEE SHEET 33 of 34

FOR DETAILS)

PARALLEL REDUNDANT CONFIGURATION WITH SLB

MODULE OUTPUT

BREAKER 1 (MOB 1)

(SEE SHEET 34 of 34

FOR DETAILS)

AC OUTPUT TO

CRITICAL LOAD

(A, B, C)

AC INPUT FROM UPM 2

(A, B, C)

NEUTRAL

GROUND

MODULE OUTPUT

BREAKER 2 (MOB 2)

SYSTEM LOAD

BREAKER (SLB) (OP-

TIONAL)

20 of 34

NOTE 1. Metal shields covering wiring

terminals must be removed to

access terminals.

2. 80/40 must be wired as 80/50.

3. 160/100 must be wired as 160/120.

80/40, 80/50, 80/60, 80/80 KVA, 208/208V AND

160/100, 160/120, 160/160 KVA, 480/480V

TERMINAL TB1

INSTALLATION INFORMATION

EATON Powerware

®

9390 UPS Sidecar Installation and Operation Manual

S 164201586 Rev E www.powerware.com

A-49