York UL R134A User Manual

Page 137

Advertising
background image

JOHNSON CONTROLS

FORM 201.23-EG1 (1007)

137

components.

4. Louvered/Wire Panels: Louvered steel panels

on external condenser coil faces, painted to

match unit panels. Heavy gauge, welded wire-

mesh, coated to resist corrosion, around base

of machine to restrict unauthorized access.

E. Evaporator options:

1. Provide 1-1/2” (38mm) cooler insulation in lieu

of standard 3/4” (19mm).

2. Provide Raised Face Flanges for cooler

nozzles:

a. 150 PSIG (10.3 bar), welded flanges (field

kit, matching pipe flange by contractor).

b. 150 PSIG (10.3 bar) companion flanges.

(not available with 460V units)

c. 150 PSIG (10.3 bar), ANSI/AWWA C-606

couplings (field kit, matching pipe flange

by contractor).

F. Flow Switch (

Field Mounted): Vapor proof SPDT,

NEMA 3R switch [ ___150 PSIG (10.3 bar) or

___300 PSIG (20.7 bar)], -20°F to 250°F (-28.9°C

to 121.1°C).

G. Building Automation System Interface:

1. Chiller to accept 4 to 20mA or 0 to 10 VDC

input to reset the leaving chilled liquid tem-

perature. (

Factory Mounted)

H. Multi-Unit Sequence Control (

Field Mounted): Sepa-

rate Sequencing control center provided to permit

control of up to eight chillers in parallel based on

mixed liquid temperature.

I. Vibration Isolation (

Field Mounted):

1. Neoprene Isolators.
2. 1 Inch Deflection Spring Isolators: Level ad-

justable, spring and cage type isolators for

mounting under the unit base rails.

3. 2 Inch Deflection Seismic Isolators: Level

adjustable, restrained mounts in rugged welded

steel housing with vertical and horizontal limit

stops. Housings shall be designed to withstand a

minimum 1.0g accelerated force in all directions

to 2” (50.8 mm).

J. Service Shut-Off Valve: Provide suction service shut-off

valve for each compressor. (

Factory Mounted)

PART 3 — EXECUTION

3.01 INSTALLATION

A. General: Rig and Install in full accordance with Manu-

facturer’s requirements, Project drawings, and Contract

documents.

B. Location: Locate chiller as indicated on drawings, includ-

ing cleaning and service maintenance clearance per

Manufacturer instructions. Adjust and level chiller on

support structure.

C. Components: Installing Contractor shall provide and install

all auxiliary devices and accessories for fully operational

chiller.

D. Electrical: Coordinate electrical requirements and con-

nections for all power feeds with Electrical Contractor

(Division 16).

E. Controls: Coordinate all control requirements and con-

nections with Controls Contractor.

F. Finish: Installing Contractor shall paint damaged and

abraded factory finish with touch-up paint matching fac-

tory finish.