4 switch–on phase, 4 switch-on phase – VEGA VEGAPULS 62 (≥ 2.0.0 - ≥ 4.0.0) Modbus and Levelmaster protocol Approval according to LPR radio standard User Manual
Page 28
+
+
power supply
MODBUS
D0
D1
IS GND
USB
3
2
1
3 4
5
2
off on
( )
(
)
(-)
(-)
4
1
Fig. 22: Connection compartment
1
Modbus connection
2
Slide switch for integrated termination resistor (120 Ω)
3
USB connection
4
Voltage supply
5
.4 Switch-on phase
After VEGAPULS 62 is connected to the bus system, the instrument
carries out a self-test for approx. 30 seconds. The following steps are
carried out:
l
Internal check of the electronics
l
Indication of the instrument type, hardware and software version,
measurement loop name on the display or PC
l
Indication of the status message "F 105 Determine measured
value" on the display or PC
l
Status byte goes briefly to fault value
As soon as a plausible measured value is found, it is outputted to the
signal cable. The value corresponds to the actual level as well as the
settings already carried out, e.g. factory settings.
Connection compart-
ment
28
VEGAPULS
62 • Approval according to LPR radio standard
5 Connecting to power supply and bus system