4 switch–on phase, 4 switch-on phase – VEGA VEGAPULS 62 (≥ 2.0.0 - ≥ 4.0.0) Modbus and Levelmaster protocol Approval according to LPR radio standard User Manual

Page 28

Advertising
background image

+

+

power supply

MODBUS

D0

D1

IS GND

USB

3

2

1

3 4

5

2

off on

( )

(

)

(-)

(-)

4

1

Fig. 22: Connection compartment

1

Modbus connection

2

Slide switch for integrated termination resistor (120 Ω)

3

USB connection

4

Voltage supply

5

.4 Switch-on phase

After VEGAPULS 62 is connected to the bus system, the instrument
carries out a self-test for approx. 30 seconds. The following steps are
carried out:

l

Internal check of the electronics

l

Indication of the instrument type, hardware and software version,
measurement loop name on the display or PC

l

Indication of the status message "F 105 Determine measured
value
" on the display or PC

l

Status byte goes briefly to fault value

As soon as a plausible measured value is found, it is outputted to the
signal cable. The value corresponds to the actual level as well as the
settings already carried out, e.g. factory settings.

Connection compart-
ment

28

VEGAPULS

62 • Approval according to LPR radio standard

5 Connecting to power supply and bus system

41722

-EN

-120706

Advertising