5 after the test run – R&M Materials Handling VARIABLE SPEED CONTROLS ControlMaster NXT Service Manual User Manual

Page 42

Advertising
background image

R&M Materials Handling, Inc.

4501 Gateway Boulevard

Springfield, Ohio 45502

P.: (937) 328-5100

FAX: (937) 325-5319

42/53

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

6.5

After the test run

Record the parameter value changes in a parameter list.
Changed values are needed if the frequency converter will be
replaced with a new one.

Upon completing the test:

Ensure that all of the remarks and parameter values are sent
to the manufacturer. Up to date parameter list ensure correct
parameter settings in spare part deliveries. See the section
“Manufacturer” for contact information.

Advertising