2getting started – SENA ProBee-ZE20S-HAOL User Manual

Page 13

Advertising
background image

ProBee-ZE20S-HAxx User Guide Rev 1.9

13

2

Getting Started

Creating a ZigBee network using the ZE20S modules consists of the following steps:

Install the ZE20S module on the development board

Create a ZigBee network by configuring a ZE20S module as the coordinator

Configure ZE20S modules as routers. This step is optional since the coordinator works as a

router too.

Configure ZE20S modules as end-devices

Transmit data between ZE20S devices

This chapter describes how to install the ZE20S modules on to the development boards and how to use

terminal software programs to access the ZE20S modules using AT commands for configurations and

operations. The rest of the steps including ZigBee network creation, coordinator/router/end-device

configurations and data transmissions are described in the following chapters. The more detailed

information on the starter kit and the configuration examples are also provided in the later chapter.

2.1

Hardware Installation

2.1.1

Development Board Layout

Figure 2-1 shows the layout of the development board. The development board provides the interface

between the ZE20S and the external serial port or USB port together with input/output terminals for

convenient tests.

Figure 2-1 Development Board Layout

Advertising