Zero voltage tripping, The only trip on zero volts settings available are, Off – do not trip – GE Industrial Solutions EntelliGuard TU Trip Units User Manual

Page 38: On – trip when all three phases are zero, Undervoltage relay, Overvoltage relay, Current unbalance relay

Advertising
background image

EntelliGuard TU Trip Units: UL/ANSI Models

DEH-4567B

Setting up the Trip Unit

28

©2012 General Electric All Rights Reserved

Voltage Unbalance is part of the optional protective relay
feature. If protective relaying is not installed on the trip unit,
this screen will not appear.

• Pickup – settable between 10% and 50% of system

voltage setpoint.

• Band – delay, from 1 to 15 seconds, between pickup

and trip. Setting the Band to OFF disables the relay.

ZERO VOLTAGE TRIPPING

The only Trip on Zero Volts settings
available are

• OFF – do not trip
• ON – trip when all three phases

are zero

UNDERVOLTAGE RELAY

Undervoltage is part of the optional protective relay
feature. If protective relaying is not installed on the trip unit,
this screen will not appear.

• Pickup – settable between 50% and 90% of system

voltage setpoint

• Band – delay, from 1 to 15 seconds, between pickup

and trip. Setting the Band to OFF disables the relay

OVERVOLTAGE RELAY

Overvoltage is part of the optional protective relay feature.
If protective relaying is not installed on the trip unit, this
screen will not appear.

• Pickup – settable between 110% and 150% of system

voltage setpoint

• Band – delay, from 1 to 15 seconds, between pickup

and alarm/trip. Setting the Band to OFF disables the
relay

CURRENT UNBALANCE RELAY

Current Unbalance is part of the optional protective relay
feature. If protective relaying is not installed on the trip unit,
this screen will not appear.

• Pickup – settable between 10% and 50% of the

average 3 phase current

• Band – delay, from 1 to 15 seconds, between pickup

and trip. Setting the Band to OFF disables the relay