High power service manual for unit sizes 6x – GE Industrial Solutions AF-600 FP High Power Unit Sizes 6x User Manual

Page 95

Advertising
background image

4.

Connect the positive (+) meter lead to the negative (-) MK3 (C). Connect the negative (-) meter lead to MK1 terminals R, S, and T in sequence. Each reading
should show a diode drop.

5.

Reverse the meter leads with the negative (-) meter lead to the negative (-) MK3 (C). Connect the positive (+) meter lead to MK1 terminals R, S, and T in
sequence. Each reading should show open.

Incorrect Reading

An incorrect reading here indicates the soft charge rectifier is faulty. The rectifier is not serviced as a component. Replace the entire soft charge card in accordance
with the disassembly procedures. Reconnect the MK3 on the soft charge card after these tests.

Illustration 6.7: Soft Charge Card Connectors

380-480/500V: Blue MOV and 8 PTCs. 525-690V: Red MOV and 6 PTCs

1

MK1

3

MK4

2

MK3

4

MK2

High Power Service Manual for Unit Sizes 6x